Skip to content
 
TOKAI CARBON GROUP
Cancarb Limited
  • About
    • Company
    • Distribution
    • Careers
  • Products
  • Applications
  • Sustainability
  • SDS
  • Contact
  • About
    • Company
    • Distribution
    • Careers
  • Products
  • Applications
  • Sustainability
  • SDS
  • Contact

Tag: Cable

  1. Home
  2. Tag Archives: Cable

Effect of Thermax N990 on EPDM UL 94 Vertical Burn

Thermax® N990 was added to EPDM compounds leading to improvements in physical properties and flame resistance.

Continue reading
Battery Enclosures Cable EPDM Flame Resistance Flame Retardant N990 Rubber UL 94 Wire

Effect of Thermax N990 on EPDM Electrical Percolation Threshold

The transition from insulative to conductive behavior was investigated for EPDM compounds loaded with N990 and N550/N990 blends.

Continue reading
Automotive Profiles Battery Cable Electrical Conductivity Electrical Resistivity EPDM Fuel Cell N990 Rubber Wire

Flame Retardant EVM

Thermax® N990 was added to a flame retardant EVM compound resulting in improvements in processability and a reduction in compound cost.

Continue reading
Cable EVM Flame Flammability Hose N990 Retardant Rubber Seal

Flame Retardant EPDM

Thermax® N990 was added to a flame retardant EPDM formulation resulting in improvements in processing and flammability properties.

Continue reading
Cable EPDM Flame Flammability Retardant Rubber Wire

Electrical Resistivity

The volume resistivity of Thermax® N990 is compared to furnace blacks and mineral fillers in EPDM and NR compounds.

Continue reading
Automotive Profile Cable Conductivity EPDM EV Insulative NR Resistivity Rubber Wire
Cancarb is the leader in the development, manufacturing
and global marketing of thermal carbon black.

Toll Free: 1.888.871.0077  (North America only)
Phone: 1.403.527.1121
Email: customer_service@cancarb.com

1702 Brier Park Cres NW
Medicine Hat, Alberta, Canada | T1C 1T9

  • Home
  • About Us
  • Distribution
  • Products
  • Applications
  • Sustainability
  • SDS
  • Safety Orientation
  • Careers
  • Contact Us

COPYRIGHT CANCARB LIMITED  | MEDICINE HAT, AB |  Trademarks  |  Legal Notice

Announcement on Cancarb Power Plant Operations

The Cancarb Power Plant is currently offline for a scheduled maintenance. As a result, waste heat is being exhausted through the bypass stack to atmosphere.

The maintenance work is expected to be completed by Saturday, January 14 with operations resuming Sunday, January 15 at which time the bypass stack will be closed and the waste heat directed to steam generation.